亚洲av片不卡无码久久,国产成人久久精品一区二区三区,人妻av综合天堂一区,男人用嘴添女人私密视频

AC source power & DC source power manufacturing factory

Test Application on AC Contactor

AC contactor is a switching device which uses electromagnetic force and spring elastic force to connect and break contacts to control the on-off of load circuit. It is suitable for frequent operation and long-distance control. It is an important component of automatic control circuit system. With the growth of national economic demand and power industry, the demand for AC contactors continues to grow, and competition is increasingly fierce. In order to ensure product quality, the testing of AC contactors is particularly important.

Following will take AC contactor test requirements as an example to introduce AC contactor test scheme in detail.
Before starting the test, we first understand its working principle: when the AC contactor's attraction coil is electrified, the static iron core produces electromagnetic attraction, the armature is absorbed, and the connecting rod connected with the armature drives the contact action, so that the normally closed contacts are disconnected, and the often open contacts are closed, both of them are linked, and the contactor is in the electrified state; When the coil is cut off, the electromagnetic suction disappears, the armature is released under the action of spring, which makes the normally closed contacts closed, the often open contacts disconnected, and the contactor is in a state of power loss.

The client test requirements are as follows: 

1. ON/OFF test: Set ON/OFF AC voltage (rated voltage), starting angle 90 degrees, termination angle 0 degrees, ON/OFF twice, and finally OFF.            
2. Characteristic test: setting voltage (rated voltage), starting angle 30 and termination angle 90 and output ON. Read peak current immediately, delay 500 ms, read and maintain current, maintain power consumption, and finally OFF.           
3. Suction voltage test: first set the suction start voltage (20% of rated voltage), output to ON, then every 200 ms, the voltage rises in accordance with 5V step up to suction, read the suction voltage, and finally output OFF.            
4. Release Voltage Test: First set the release starting voltage (rated voltage), output to ON, set the release voltage (rated voltage 68%) and then every 200 ms, the voltage descends according to 5V step to read the release voltage after release; finally output the OFF.

Among them:
Test requirements 1,2, can be achieved by the panel setting function of ADMIRE POWER standard AC power supply APA1000 series . This function can be set voltage, frequency, starting phase angle and terminating phase angle. The range of setting phase angle is 0-360.

Test requirements 3,4, can be achieved through the ADMIRE POWER standard AC power APA1000 series power supply internal test group, the function can be set up 35 test points to set the starting voltage value, termination voltage value, step voltage value, start frequency, termination frequency and single step time, so that the power supply voltage and time Frequency varies in a step-by-step fashion. If the 35 test points are not enough, the intelligent AC power supply APA2000 series (touch screen display) can provide five test groups, each of which has 35 test points, and each test point can set different voltage, frequency and time.

Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

TECHNIC

SERVICES
亚洲熟女乱综合一区二区 | 久久久久亚洲精品中文字幕| 日本丰满熟妇hd| 国产精品久久久久国产a级| 狠狠色噜噜狠狠狠狠色综合久| 免费人成视频xvideos入口| 中文字幕aⅴ人妻一区二区| 最近最新中文字幕| 免费观看交性大片| 日本亚洲色大成网站www久久| 蜜臀av性久久久久蜜臀aⅴ麻豆| 色综合久久久久综合体桃花网| 国产丝袜视频一区二区三区| 国产精品无码制服丝袜| 真人新婚之夜破苞第一次视频| 国产日韩av在线播放| 无码人妻久久久一区二区三区| 中国丰满人妻videoshd| 精精国产xxxx视频在线播放| 少妇特殊按摩高潮惨叫无码| 少妇脱了内裤让我添| 精品久久久久久久中文字幕| 亚洲精品国产精品乱码在线观看| 三级特黄60分钟在线观看| 久久av无码精品人妻系列| 国产精成人品| 亚洲精品乱码久久久久久按摩| 国产又大又硬又粗| 国产又大又硬又粗| 国产精成人品| 国产97在线 | 亚洲| 四虎影在永久在线观看| 久热综合在线亚洲精品| 精品国产综合区久久久久久| 在办公室被c到呻吟的动态图| 国内精品久久久久久99| 国产婷婷色一区二区三区在线| 邻居少妇张开腿让我爽了一夜| 999国产精品999久久久久久| 图片小说视频一区二区| 天天干夜夜操|