亚洲av片不卡无码久久,国产成人久久精品一区二区三区,人妻av综合天堂一区,男人用嘴添女人私密视频

AC source power & DC source power manufacturing factory

How to distinguish DC charging pile from AC charging pile?

Charging pile is a charging facility for "refueling" electric vehicles. Its scientific name is "non-vehicle charger". Charging pile is divided into AC charging pile and DC charging pile. What is the difference between AC charging pile and DC charging pile?

The function of charging pile is similar to that of the tanker in the gas station. It can be fixed on the ground or wall, installed in public buildings (public buildings, shopping malls, public parking lots, etc.) and residential parking lot or charging station. It can charge various types of electric vehicles according to different voltage levels. The input end of the charging pile is directly connected with the AC network, and the output end is equipped with a charging plug for charging the electric vehicle.

At present, charging piles are divided into AC charging piles and DC charging piles. The output single-phase/three-phase alternating current of AC pile is converted into direct current through vehicle charger to charge vehicle-mounted batteries. The power of AC pile is generally small (7 kw, 22 kw, 40 kw, etc.). The charging speed is generally slow, so it is usually installed in parking lot and other places.

DC charging pile (or non-vehicle charger) is directly output direct current to charge vehicle-borne batteries. It has high power (60 kw, 120 kw, 200 kW or higher), and its charging speed is faster. Therefore, it is usually installed in charging stations beside expressways.

So how to judge whether a pile is a DC pile or an AC pile from its appearance?

Generally speaking, the DC charging pile is rough (because there are a certain number of AC-DC power supply modules inside, the higher the power, the more the number of modules, the larger the pile), and the AC charging pile is smaller. The more obvious difference is that its gun head (charging line) is different. The DC charging pile is a 9-wire plug, while the AC charging pile is a 7-wire plug.

The output of DC charging pile consists of nine wires: DC+, DC-, PE of equipment ground, S+, S-, CC1 and CC2 of charging connection confirmation line, A+, A-, of low-voltage auxiliary power supply line.

The output of AC charging pile consists of seven wires: AC power line L1, L2, L3; equipment ground line PE; midline N; connection confirmation line CC; control guide line CP.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
国产精品偷窥熟女精品视频| 欧洲人妻丰满av无码久久不卡| 亚洲人成未满十八禁网站| √新版天堂资源在线资源| 精品日本一区二区三区在线观看| 无套内谢老熟女| 俺来也俺去啦最新在线| 亚洲中文字幕久久精品无码a| 精品久久久久久久免费人妻| 无套内射极品少妇chinese| 人人妻人人爽人人做夜欢视频九色| 欧美日本精品一区二区三区| 熟女少妇精品一区二区| 中国老太婆bb无套内射| 少妇一晚三次一区二区三区| 亚洲精品v天堂中文字幕| 久久青青草原一区二区| 黑人大荫道bbwbbb高潮潮喷| 狠狠色噜噜狠狠狠7777奇米| 丰满熟妇人妻中文字幕| 亚洲 日本 欧美 中文幕| 精品人妻一区二区三区四区| 97人妻精品一区二区三区| 网禁拗女稀缺资源在线观看 | 少妇特殊按摩高潮惨叫无码| 久久久久国产综合av天堂| 六月丁香综合在线视频| 7878成人国产在线观看| 国产96在线 | 亚洲| 性色av闺蜜一区二区三区| 国产乡下三级全黄三级bd| 影音先锋中文字幕人妻| 亚洲av无码乱码精品国产| 日本高清视频www| 中文字幕亚洲综合久久| 无遮挡边吃摸边吃奶边做 | 国产亚洲日韩欧美一区二区三区 | 天堂中文8资源在线8| а天堂中文在线官网在线| 怡红院免费的全部视频| 永久免费av无码网站性色av|