亚洲av片不卡无码久久,国产成人久久精品一区二区三区,人妻av综合天堂一区,男人用嘴添女人私密视频

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
成 人免费va视频| 呦系列视频一区二区三区| 久久国产精品波多野结衣av| 久久aⅴ人妻少妇嫩草影院| 曰本无码人妻丰满熟妇啪啪| 特大巨黑吊xxxx高潮| 国产国产精品人在线视| 又爽又高潮的bb视频免费看| 国产裸体歌舞一区二区| 免费网站看v片在线18禁无码| 夜鲁鲁鲁夜夜综合视频欧美| 97久久精品人人澡人人爽| 国内精品人妻无码久久久影院| 日本高清视频wwww色| 夜夜爽妓女8888视频免费观看| 国产无遮挡又黄又爽在线视频| 中文字幕久久熟女蜜桃| 蜜臀av无码精品人妻色欲| 亚洲第一se情网站| 自拍偷自拍亚洲精品播放| 亚洲欧美中文字幕5发布| 亚洲成亚洲乱码一二三四区软件 | 99久久无色码中文字幕人妻蜜柚| 妺妺窝人体色www婷婷| 老头边吃奶边弄进去呻吟| 欧美最猛黑人xxxx| 精品人妻少妇嫩草av无码专区| 国产内射合集颜射| 国产aⅴ激情无码久久久无码| 精品无码国产自产拍在线观看蜜| 亚洲熟女乱综合一区二区| 伊人久久大香线蕉av不卡| 国产精品久久久久久久久电影网 | 久久午夜夜伦鲁鲁片免费无码影视| 华人少妇被黑人粗大的猛烈进| 亚洲成av人片在线观看天堂无码| 久久国产劲爆∧v内射-百度 | 欧美精品久久久久久久自慰| 日本熟妇浓毛| 无码 人妻 在线 视频| 性猛交╳xxx乱大交|